With cumulative spent of over 46.8 billion US dollars on sourcing goods and services locally TCO remains a leading contributor into Kazakhstani content development

At TCO we search, identify and develop local suppliers for world-class projects like Tengiz

TCO operates one of the largest and technologically challenging oilfields in the world. Safety and reliability of exploration and production operations in Tengiz are the key to success in fueling Kazakhstani's economic progress and fulfilling global energy demand. Our mission is to source goods and services that meet international standards while enabling opportunities for local suppliers and talents.

TCO contribution to the economy of the Republic of Kazakhstan (in US dollars)

01

West-Kazakhstan region

  • STAFFING EARTHWORK/SITE PREPARATION PERSONAL SAFETY/PROTECTION EQUIPMENT RENTAL
  • NITROGEN TANK CLEANING SERVICES
  • FENCES
  • ASSEMBLY BALL VALVES
02

Aktobe region

  • BUILDING MATERIALS (GRAVEL) DESIGN AND SURVEY WORKS
  • RENTAL OF RAILWAY CARS
03

Atyrau region

  • PIPELINE TRANSPORT STAFFING
  • PROJECT MANAGEMENT SERVICES BUILDING MAINTENANCE CIVIL WORKS
  • RENTAL OF RAILWAY CARS RENTAL OF MINING EQUIPMENT OIL AND GAS PROCESS DEVELOPMENT EQUIPMENT RENTAL
  • DEVICES AND VESSELS OF FACTORY PRODUCTION
  • GAS CONTROL UNIT GROUP STRUCTURAL STEEL PRODUCTION THREADED STUD
04

Mangistau region

  • GENERAL CONSTRUCTION, MARINE WORKS AND REGULATORY AND LEGAL SUPPORT
  • STAFFING TECH.
  • OIL AND GAS PROCESS DEVELOPMENT
  • POWER PLANT CONSTRUCTION TRANSPORTATION-CONSTRUCTION AND MAINTENANCE CHEMICAL PLANT DEVELOPMENT
  • EARTHWORKS/SITE PREPARATION CONSTRUCTION AND REPAIR OF SHIP DOCKS REMOTE INSTRUMENT UNITS
  • EARTHWORKS
05

Kostanay region

  • MEDICAL EQUIPMENT/ CONSUMABLES
06

North-Kazakhstan region

  • SECURITY EQUIPMENT SYSTEM AND SOFTWARE DEVELOPMENT ENVIRONMENTAL MANAGEMENT
07

Akmola region/Astana

  • PIPELINE TRANSPORT RAILWAY RENTAL CATERING
  • CUSTOMS BROKER SERVICES TAXI/LIMOUSINE RENTAL SERVICES
08

East Kazakhstan region

  • INSPECTION SERVICES MATERIALS/PRODUCTS
  • REPAIR OF ELECTRICAL EQUIPMENT MEDICAL EQUIPMENT BUILDING MATERIALS (CEMENT)
09

Almaty region/Almaty

  • PRODUCTION SUPPORT OFFICE RAIL CAR RENTAL PIPELINE TRANSPORT ACCOMMODATION/HOTELS
  • TRANSPORTATION OF PETROLEUM PRODUCTS BY ROAD TRANSPORT
  • RENTAL PROPERTY
  • CUSTOMS BROKER SERVICES STAFFING ASSEMBLY-TYPE SUBSTATIONS HVAC INSTRUMENTS (VALVES),
  • FACTORY-MADE APPARATUS AND STEEL SHEETS ENGINEERING SERVICES (FOR BUILDINGS AND ASSEMBLY SYSTEMS) BUILDING WALL MASONRY
10

Jambyl Region

  • HVAC SERVICES
  • undefined
11

South Kazakhstan (Turkestan) region

  • LUBRICANTS PROTECTION ELECTRIC CIRCUIT BUILDING MATERIALS (CEMENT)
12

Karagandy region

13

Pavlodar region

TCO contribution to the economy of the Republic of Kazakhstan

Contracting & Procurement Plan

Our contracting and procurement plan outlines supply opportunities that TCO has in different areas of its operations.

Supplier Expression of Interest

Suppliers interested in doing business with TCO shall submit application through the link below: Link to Supplier Expression of Interest (SEOI)

Note: TCO also utilizes the O&G industry ALASH database (www.alash-kz.com) to identify prospective suppliers.

business-opportunities

The information contained in the TCO contracting and procurement plan is a forecast of Tengizchevroil LLP's (hereinafter – TCO) needs in goods, works or services for the upcoming period referenced therein. The publication of data related to these forecasted sourcing, contracting and/or procurement activities is provided for information only and shall not be considered as a commitment by TCO to conduct any given activity or an offer by TCO to any person to participate in it. Sourcing, contracting and/or procurement activities published earlier may be postponed, modified or cancelled at TCO's own discretion without prior notice. Please monitor this website regularly for any updates. TCO explicitly waives any responsibility or liability for any damages or losses that may be sustained by any person arising out of or in connection with such person's reliance on the data published in TCO's contracting and procurement plan.

Recent events

16 January, 2023, 6 PM

Seminar

  • Brief summary of the planned event and photos. Brief summary of the planned event. Brief summary of the planned event.
20 January, 2023, 6 PM

Seminar

  • Brief summary of the planned event and photos. Brief summary of the planned event. Brief summary of the planned event.
7 February, 2023 at 9 AM

Seminar

  • Brief summary of the planned event and photos. Brief summary of the planned event. Brief summary of the planned event.

Creating opportunities for local suppliers

Understanding international standards of operation and meeting world-class safety and quality requirements are critical for local suppliers to successfully work with TCO. We continuously look for opportunities to offer and invest our resources into bringing suppliers to the next level of sustainable operation.

docTengizchevroil Kazakhstani Content Development
opportunities-suppliers

We are interested in cooperation with local suppliers operating in the following areas:

Looking like a good fit?

Please email us at
kcdsearch@tengizchevroil.com

Electrical
01
Electrical

HV cables, LV distribution boards, transformers, Substation, Remote Terminal Units

Maintenance
02
Maintenance Services

HV motors repair service, Heat exchanger, Retubing facility

Construction
03
Construction

Tanks and vessels

repair-operation
04
Maintenance repair & operation

Valves, Flanges & fittings, Stud bolts, Spectacle blinds & spacers

IT-TELECOM
05
IT/TELECOM

Fiberoptic cable

Health-Safety
06
Health, Environment and Safety

Waste recycling, safety and compliance online training, wood waste removal, safety garments

How long-term contracting strategy works?

In 2019 alone TCO and its suppliers fulfilled 13 Kazakhstani content plans under long-term contracts

TCO works with globally recognized original equipment manufacturers (OEM) to maintain safe, reliable and uninterrupted production operations and continue executing FGP-WPMP project. We have partnered with several OEMs to create lonough building infrastructure, technology transfer and talent development

strategy1
01

TCO identifies opportunities for local content development with existing and potential suppliers

strategy2
02

TCO and suppliers negotiate these opportunities and Kazakhstani Content plan is created

strategy3
03

TCO and suppliers formalize KC plans within the agreements

strategy4
04

TCO continuously monitors compliance and performance

Manufacturers of foreign equipment

TCO works with globally recognized original equipment manufacturers (OEM) to maintain safe, reliable and uninterrupted production operations and continue executing FGP-WPMP project. We have partnered with several OEMs to create long-lasting benefits for the economy of Kazakhstan though building infrastructure, technology transfer and talent development.

Manufacturers-foreign-equipment

Doing it Right Way

When it comes to local content, measuring our performance is important to track our success...

Interested in enrolling? Please email us at

kcdsearch@tengizchevroil.com

Read more
Doing-Right-Way

Doing it Right Way

When it comes to local content, measuring our performance is important to track our success. Calculation and reporting of Kazakhstani content spent is one of the legal requirements for TCO. It’s in our best interests to ensure that TCO suppliers are familiar with methodology of KC calculation. On a quarterly basis we conduct relevant training for our Business Partners that cover certain aspects of Subsoil Use Code and governmental decrees, which govern the calculation of local content, basic concepts and definitions, and examples of calculating KC in goods and services spent. Please note that this training is dedicated to TCO’s current suppliers and contractors only.

TCO News

All TCO News
  • #TCO 30 April 2024
    TCO volunteers had provided humanitarian aid for Zhylyoi district during the flood

    As soon as the first evacuated residents of Kulsary, most of whom were women, the elderly, and children, arrived at rotational accommodation camps located near Tengiz field at 2 a.m. on April 6, Tengizchevroil (TCO) employees immediately mobilized a group of volunteers and began collecting humanitarian aid. So, by 10 a.m. on April 6, both TCO employees and employees of its business partners learned that humanitarian aid was being collected at TCO Headquarters for residents of Zhylyoi district.

  • #FGP-WPMP 25 April 2024
    TCO Starts Up WPMP Operations At Tengiz

    Atyrau, Kazakhstan, April 25, 2024 — Tengizchevroil LLP (TCO) has safely started operations at its Wellhead Pressure Management Project (WPMP) at the Tengiz oil field, with the conversion of the first metering station to low pressure, and by bringing online the associated Pressure Boost Facility (PBF).

  • #TCO 06 April 2024
    TCO Allocates 2 Billion Tenge For Flood Response

    Atyrau, Kazakhstan – April 6, 2024 – Tengizchevroil LLP (TCO) stands united with the residents of Atyrau oblast and the people of Kazakhstan during this challenging time.

  • #TCO 30 April 2024
    TCO volunteers had provided humanitarian aid for Zhylyoi district during the flood

    As soon as the first evacuated residents of Kulsary, most of whom were women, the elderly, and children, arrived at rotational accommodation camps located near Tengiz field at 2 a.m. on April 6, Tengizchevroil (TCO) employees immediately mobilized a group of volunteers and began collecting humanitarian aid. So, by 10 a.m. on April 6, both TCO employees and employees of its business partners learned that humanitarian aid was being collected at TCO Headquarters for residents of Zhylyoi district.

  • #FGP-WPMP 25 April 2024
    TCO Starts Up WPMP Operations At Tengiz

    Atyrau, Kazakhstan, April 25, 2024 — Tengizchevroil LLP (TCO) has safely started operations at its Wellhead Pressure Management Project (WPMP) at the Tengiz oil field, with the conversion of the first metering station to low pressure, and by bringing online the associated Pressure Boost Facility (PBF).

  • #TCO 06 April 2024
    TCO Allocates 2 Billion Tenge For Flood Response

    Atyrau, Kazakhstan – April 6, 2024 – Tengizchevroil LLP (TCO) stands united with the residents of Atyrau oblast and the people of Kazakhstan during this challenging time.